BHQ Operating Hours

We received the following letter from PSC regarding operation of the quarry outside the conditions of consent:

Hi Neil,

I just wish to advise you and your group that Council wrote to the quarry operator on 12 February 2019 and reinforced its position in relating to the approved operating hours (as stated in Councils submission to the Department of Planning and Environment) and requested that they comply with their development consent conditions.

The Manager of Development Assessment and Compliance also discussed the matter with the EPA relating to the quarry operator’s Environmental Protection Licence.

Regards

Greg Rodwell
Development Compliance Officer

Note that PSC’s submission to the DPE quoted the EIS stating “operations will be … 6am to 6pm Monday to Saturday.
PS Thanks to all the new people Following our website

January 2019 Update

In this post

We have enjoyed the festive season break and hope you did too, but there has still been quite a bit happening regarding our quarries.

In this update there is information on further Martins Creek Quarry court outcomes. These are significant because of the direct impact of their haulage trucks on our roads but also because they set precedents relevant to the Brandy Hill Quarry expansion. There was a CCC meeting in November, a list of questions from CCC community members and the answers were recently received from Hanson. Lastly, there is information on where the expansion approval process is up to.

Hanson held a “have a chat” session on 6th February. More on all these matters follow.

Martins Creek Quarry

The land and environment Court ruled in October that the 1990 EIS and consent were the valid conditions for that quarry and that Daracon were operating the quarry well outside the consent and therefore illegally. The court issued orders that Daracon must comply with the consent, which imposed severe limits on the areas it could extract, the annual tonnage and amount by road.

The judge gave a three month stay on the orders to allow alternatives to be arranged by customers and contractors and for Daracon to find alternative employment for staff and workers, as they claimed that abiding by the consent would force closure of the quarry. The stay would expire in January. The ruling also gave Daracon the option to apply for an extension of the stay. During the stay period, Daracon was allowed to continue operating at levels greater than the consent, but less than they had been.

Daracon naturally applied for an infinite extension of the stay on the orders, and that was heard by the court in December. Two community representatives were invited by the judge to make presentations to the court. James Ashton from MCQAG and Neil Ritchie from BHSAG spoke against an extension of the stay, as did the DSC legal team. A significant outcome of the hearing was that the EIS for the new State Significant Development Application must be redone because the baseline is now the 1990 consent. The earliest expected completion of the new approval process is March 2020, probably later.

The judge could not condone the illegal activities continuing for that long, so the application for an infinite extension on the stay of orders was rejected. A compromise extension of just two months was granted, so Daracon have until early March to comply with the Orders. We will wait and see if they close,  scale back activity or increase rail haulage, from March until a new approval is granted.

One of the key findings in the October ruling is that key documents that were the basis of a consent, such as the EIS and any key restrictions, limitations or conditions in those documents are incorporated into the consent.

This gives a strong legal basis for us to reject Hanson’s claim that they have 24/7, as the Brandy Hill Quarry 1983 EIS states in three sections that operations will be 6am to 6pm Monday to Saturday, and this adds to PSC’s submission to the DPE that as the consent authority, it believes the approved hours are 6am to 6pm Monday to Saturday.

Neil had a phone conversation with Genevieve Seed who is the DPE officer responsible for the BHQ expansion, to ensure that the department is fully aware of the implications of the court rulings, PSC’s stance on the approved operating hours, and the devastatingly detrimental impact that 24/7 operations would have on the character and amenity of our residential areas.

Finally, have you noticed the reduction in truck traffic from Martins Creek, and the reduction in early morning and late evening truck movements since the October ruling? It has been quite dramatic and very welcome and shows the positive impact that restricted operating hours has on local amenity and rural/residential character. Daracon have not asked for 24/7 in their EIS, but have sought to extend the hours from what the current consent permits.

Brandy Hill Quarry

The expansion proposal is still in the hands of the DPE in the “Assessment” phase. We are waiting on the DPE to make recommendations to the Independent Planning Commission (IPC). The IPC will then call a public meeting to hear more submissions , and then they will make a ruling for the DPE to implement. The DPE advised me in January that they are still waiting on information from Hanson, and that the earliest that their recommendations would be available is late February. It will probably be later than that.

Things that have happened since the last post:

  • There was a CCC meeting in November. Here are the minutes:
    Finalised minutes from Brandy HIll CCCC held 15-11-18
  • One of the actions from the above meeting was for the community members of the CCC to present Hanson with any questions.  These were submitted in December and here are the answers: BHQ – Response to Community Questions_January 2019Again, nothing new, but it may clarify some issues in people’s minds.
  • Another action Hanson proposed was to hold a “have a chat session”.
    The first of these was held on Wednesday 6th at the farmhouse at 888 Clarence Town Road, opposite the quarry.
    It seems quite a few members of the public attended along with some BHSAG members. There was not much new information, but one point was that Hanson do not expect to build the concrete batching plant as it is much more expensive to cart concrete than gravel and sand. In other words it is more economical to have the batching plants close to the market. Hanson are just including provision for batching into the potential scope of the new approval. They have no plans to close or relocate the Raymond Terrace batching plant.
    One new item was the release of a draft document titled: “Community and Stakeholder Engagement Plan”. I don’t have an electronic copy, so that will be posted as soon as it is available.
    My initial impression is that it is to tick a box with DPE.
    Hanson is trying to steer the issues of amenity and safety (pathway, intersection improvements and bus stops) into the voluntary planning agreement (VPA) , and the recommendation/decisions on the allocation of the meager transport levy toward the above, to a committee.
    Our view is that the DPE/IPC must make the safety issues prerequisites to the new consent. These items are not negotiable and must not be at the expense of other road maintenance funds.The subject of Hanson continuing to claim they currently have 24/7 was raised again. Hanson stated that they have a document to that effect and legal advise that they can operate 24/7, but still have not produced any proof. This is despite PSC stating in their RTS that 6am to 6pm Monday to Saturday as stated in the EIS is the approved operating hours. PSC were and still are the consent authority for the 1983 approval.
  • Hanson advised that the next CCC meeting will be held on the 21st February.

So in summary, Hanson is not budging from wanting 24/7 for crushing and despatch. They have no compassion or willingness to preserve the character or amenity of our area. Hanson continues to be evasive and non committal regarding offering any infrastructure to improve the safety at any intersections (the quarry entrance is the obvious one in need of improvement), or for pedestrians cyclists and school children and buses along Brandy Hill Drive.

Requested Pathway

Neil regularly cycles the eastern end of Brandy Hill Drive to Seaham. The cutting near the “Wallaby XING” is typical of the other cuttings. The lane from centreline to shoulder line is just 3 metres wide. There is no shoulder outside the line. The shoulder line is a far left as I can ride.  His bike protrudes 0.3m into the lane. If there is oncoming traffic, traffic cannot overtake and give the required 1.5m clearance without crossing into the oncoming lane, so must slow to his speed. Trucks are 2.4m wide, so a truck needs to cross a minimum of 1.2m into the oncoming lane, and more to provide any margin of safety, or slow to the cyclist speed.

These photos show a truck in the cutting near Eloura Cl and two trucks meeting near Warrigal Cl where both cross over the shoulder lines. That is also a blind crest and corner! A cycleway, as per PSC’s Cycleways Plan, is mandatory to allow cyclists to get off Brandy Hill Drive. Of course there are lots of other reasons for a pedestrian pathway as well, and we’ll cover those in a later post.

image1.jpegIMG_1579.jpg

Please encourage friends and neighbours to follow this site in order to automatically receive future posts.

We are also keen to get the views of anyone who attended the chat session, or has any other feedback.

BHSAG

 

 

 

Hanson have lodged their “Response To Submissions” (RTS) with the Department of Planning and Environment (DoPE)

This was posted on 11th October, but did not appear to get mailed out so it is being posted again. Some updates have been added at the end.

 

On 9th October we received the following email from DoPE.

We have received the Response to Submissions report for the Brandy Hill Expansion Project, and it can be viewed on our website at http://majorprojects.planning.nsw.gov.au/index.pl?action=view_job&job_id=5899

The Department will now send the RTS to agencies and Council for comment, and commence its assessment of the application.

Upon completion of our assessment, the application will be referred to the Independent Planning Commission (IPC) for determination. At this time, there will be further opportunity for members of the public to comment on the project, either in writing or by registering to speak at the public meeting.

Please contact me if you have any further questions, or would like to discuss.

Kind regards,

Genevieve Seed
Senior Planning Officer

Resource Assessments
320 Pitt Street | GPO Box 39 | Sydney NSW 2001
T 02 9274 6489

We have not had time to fully read and understand the RTS which can be accessed from the link above. There are 5 RTS documents. The last one is the main document. It is clear that Hanson have not listened to the community’s submissions as they have not altered their proposal in any way as a result of the submissions. During the past 4 years the community representatives on the CCC have used every opportunity at meetings to express community views and concerns.  The only changes they have offered are all to meet rules and regulations regarding noise, dust traffic etc.

Our primary concern about 24/7 has not been addressed. Hanson still ask for around the clock dispatch and secondary crushing.

Safety and amenity along Brandy Hill Drive has not been addressed with any offer to help build a footpath or bus stop bays.

No additional voluntary contributions are offered for roads, intersections or for road haulage trough other council areas eg Maitland City Council (MCC). (Just as we in PSC would expect Martins Creek quarry would to contribute to the maintenance of roads used through MCC and PSC areas).

You are invited to draw your own conclusions.

Please send us your comments about the RTS via our website, and we will post them for all to see.

BHSAG has send a letter to DoPE expressing our huge disappointment in the RTS and implore the department to recommend changes to the consent, when it is handed to the IPC.

We have also spoken with Councillor LeMottee and PSC staff, who are equally disappointed in the RTS, and have offered to collaborate with PSC to align our positions.

The DoPE expects responses from the other agencies by the end of October, and BHSAG expects to provide more information in a similar timeframe.

 

Margarete & Neil

on behalf of BHSAG

Judge’s Ruling on the Martins Creek Quarry Court Case

As you know, Daracon has been transporting gravel from the Martins Creek Quarry along Butterwick Road, Clarence Town Road, Brandy Hill Drive and Seaham Road for a number of years. It has been a burden on those residents who live along these roads in particular, as it combines with truck traffic from the Hanson quarry. In addition to that, Daracon has not paid any road levy to any of the three council’s including Port Stephens Council, for road maintenance or improvements. and truck traffic through Paterson risks the closure of businesses and the loss of the services they provide.

On 12th October, the judge finally handed down his ruling on the court case. The court hearing was held in April last year.  Dungog Shire Council brought the action against Daracon for 11 breaches of the conditions of consent for the operations of the quarry.

It is difficult to summarise such a long document but here are a few key points.

  1. Council has won on many of the declarations and orders. The court has confirmed the Martins Creek Quarry operations are illegal in many respects.
  2. The 1991 consent issued to State rail was ruled to be the valid conditions for operations as a railway ballast quarry and not as a general quarry.
  3. The judge also ruled and that the EPA license variation to 2 million tonnes/annum was illegal.
  4. The judge issued a number of orders regarding ongoing operations, which contain restrictions. Operations must abide by an Interim Environmental Management Plan (which was volunteered by Daracon), that must be fully implemented within 3 months.
  5. The 3 month stay before the orders take effect is to reduce the impact on employees and avoid the adverse consequences of a sudden curtailment in supply to existing projects.
  6. Daracon may make a further application to the court if in 3 months they have not received an SSDA approval.
  7. Being a civil matter, there is no fine, restitution order or gaol-term, however, Daracon pays court costs and the ruling provides a strong basis for further court actions seeking damages.

So it is a good outcome. The delay was explained in that the 350 pages covering the 11 separate matters, is the longest ruling in the history of the Land and Environment court! That is even even larger than the Mabo land rights case!

The full ruling is now available on the Land and Environment court’s website: DSC v Daracon

If you open the link, scroll down just a few pages to the “Table of Contents”. Each entry is also a link to that section, so click to go straight to that section. We suggest you go to the section “THE OUTCOME OF THE PROCEEDINGS” for the summary.

We don’t see any direst impact on the Brandy Hill Quarry expansion proposal.

We will be watching for the next steps with interest. Will the quarry curtail operations? Will they redo their SSDA proposal for expansion? What will happen next in the courts?

Till next time.

Hanson have lodged their “Response To Submissions” (RTS) with the Department of Planning and Environment (DoPE)

On 9th October we received the following email from DoPE.

We have received the Response to Submissions report for the Brandy Hill Expansion Project, and it can be viewed on our website at http://majorprojects.planning.nsw.gov.au/index.pl?action=view_job&job_id=5899

The Department will now send the RTS to agencies and Council for comment, and commence its assessment of the application.

Upon completion of our assessment, the application will be referred to the Independent Planning Commission (IPC) for determination. At this time, there will be further opportunity for members of the public to comment on the project, either in writing or by registering to speak at the public meeting.

Please contact me if you have any further questions, or would like to discuss.

Kind regards,

Genevieve Seed
Senior Planning Officer

Resource Assessments
320 Pitt Street | GPO Box 39 | Sydney NSW 2001
T 02 9274 6489

We have not had time to fully read and understand the RTS which can be accessed from the link above. There are 5 RTS documents. The last one is the main document. It is clear that Hanson have not listened to the community’s submissions as they have not altered their proposal in any way as a result of the submissions. During the past 4 years the community representatives on the CCC have used every opportunity at meetings to express community views and concerns.  The only changes they have offered are all to meet rules and regulations regarding noise, dust traffic etc.

Our primary concern about 24/7 has not been addressed. Hanson still ask for around the clock dispatch and secondary crushing.

Safety and amenity along Brandy Hill Drive has not been addressed with any offer to help build a footpath or bus stop bays.

No additional voluntary contributions are offered for roads, intersections or for road haulage trough other council areas eg Maitland City Council (MCC). (Just as we in PSC would expect Martins Creek quarry would to contribute to the maintenance of roads used through MCC and PSC areas).

You are invited to draw your own conclusions.

Please send us your comments about the RTS via our website, and we will post them for all to see.

BHSAG intends to send a letter to DoPE to express our huge disappointment in the RTS and implore the department to recommend changes to the consent, when it is handed to the IPC. That letter will be posted when it is finalised.

PS. The court ruling in the DSC Vs Daracon case regarding Martins Creek Quarry is expected on Friday 12th October. We will bring you details as they come to hand.

Margarete & Neil

on behalf of BHSAG

V.O.W.W. Mayor to speak at AGM Meeting 19th September

The VOWW AGM will be held at the Woodville School of Arts Hall on Paterson Rd next Wednesday from 6:30pm. The Mayor, Ryan Palmer will speak first about his initial term in office and the council’s vision for West Ward.

Please come along, renew your membership or join VOWW and support the community organisation. The attached flyer explains more about the organisation and it’s goals, and also more about the meeting.

We hope you can make it.

2018-09 VOWW flyer DRAFT3

 

On 16th August, have your say on the proposed PSC rate rise

This note is from the Seaham Park & Wetlands Committee.

Hi Everyone

HAVE YOU GOT 10 MINUTES?   DROP IN.   HAVE YOUR SAY.   ASK QUESTIONS.  THURSDAY THIS WEEK.

Port Stephens Council will bring its proposal and the reasons for the planned increase in our rates,  from 4pm – 6pm on Thursday 16th August at Seaham Hall.  Not just Seaham, East Seaham, Glen Oak, Wallalong, Hinton, Dunns Creek but the whole Council area will be covered by this rate rise.

Please come along and meet Council staff, Mayor and local Councillors and drop in and have your say.  You are paying the rates and therefore it is your money.  Drop in anytime between 4pm and 6pm.

If we are to pay extra rates then the extra funds should be spent in our local area and not be spent in the Nelson Bay area.  A $10 million multistorey car park at Nelson Bay is not in our local area.

A think-tank of Seaham and district locals have come up with some suggestions of what Council could do with the extra rate revenue in our area:

–         A shared pathway for bikes and walkers along Brandy Hill Drive.

–         The Brandy Hill Drive pathway to extend alongside Seaham Road and connect with the pathway at Brandon Park which goes to Seaham School.  This would take children and cyclists off much of Seaham Road.

–         A bus shelter for the school children outside Seaham School.

–         Outdoor gym equipment for Seaham Park.

–         A path from Seaham Shop to the Preschool to take bikes and pedestrians off busy Cross Street and Torrence Street.

–         A path along the eastern side of Dixon Street to take pedestrians and bikes off the road and allow easier access for cars going to Still Street to drop off and collect school children from the main entrance of Seaham School.

–         A zebra crossing (pedestrian crossing) outside the Seaham Shop.

–         Seal all gravel roads.

You may have other suggestions.  Let Council know.

For more information visit www.portstephens.nsw.gov.au

Come along.  Have your say.  Ask questions. 

Seaham Park & Wetlands Committee

July 2018 Update – MCQ and BHQ

Martins Creek Quarry

Despite the court case brought by DSC closing in April last year, a ruling has still not been made. However, Jacqui Tupper (DSC) notified MCQAG that the court has advised the parties that judgment on the Martins Creek Quarry matter will be handed down by the 17th August 2018. 

The following is a mail-out from MCQAG on 11th July. We encourage you to contact Umwelt to give them your perspective on how that quarry affects you. BHSAG committee members will be meeting with Umwelt. The cumulative impact of both quarries on our area is still a major concern.

Dear Members and Friends

you are receiving this email because we have you in our database as either a financial member of MCQAG or you have lodged your email on our website for updates on Martins Creek Quarry Expansion.

As you may know, MCQAG has never advocated for the closure of Martins Creek Quarry, only that any new consents require the facility to operate at a more reasonable scale that enables the quarry to coexist with residents and neighbours around the site and along the haulage route.

Quarry Expansion Update

Daracon has commenced the “Response to Submissions” stage of the State Significant Development Application process. Daracon has engaged Umwelt an environmental consulting firm based in Teralba as the lead consultancy to perform this work. 

MCQAG committee has met with Umwelt in the past three months, they have explained that they will be re-commencing community consultation and various environmental studies on the project over the coming months.

Umwelt have posted a Community Information Sheet to affected residents during the month of June. The flyer provided information on Daracon’s “Refined Project”. We are aware that many residents have not received this flyer and so we have attached a link to the document: Daracon Community Update

As you can see in the flyer Daracon’s refined project consists of;

  • 900,000 tonne per annum by road
  • 60 truck movements per hour
  • 280 truck movements per day
  • No loading of trucks or pit operations prior to 7am six days per week

The MCQAG committee’s view of the “Refined Project” is that the 7am starting time for load out of trucks and quarry operations is good news for impacted residents however the intensity of the operation proposed on an hourly basis in this refinement match and even exceeds that which was experienced in 2014 and 2015 when life around the facility and along the haulage route (particularly within the activity centre of Paterson) was simply unlivable; with intolerable impacts on our way of life, rural amenity and village character. The proposed increase in daily truck traffic is a 1166% increase in the currently approved 24 trucks per day from the site and the annual extraction limit proposed is a 300% increase from the currently approved 300,000 tonne per annum scale.

We Recommend You Take the Following Action

As noted in the community information sheet link above, Umwelt is commencing stakeholder engagement with affected residents. MCQAG encourages you all to register your interest with Umwelt (via their email social-team@umwelt.com.au) to ensure you get to participate in their consultation process. Importantly MCQAG strongly recommends you;

  • Register with Umwelt to participate in the consultation process using the email above
  • When dealing with Umwelt, remain steadfast regarding the issues that effect you and your community, remember the issues and impacts detailed in your submissions have most likely not been addressed with the refined project parameters listed above
  • Keep records of your discussions with Umwelt
  • Do not allow Umwelt or Daracon to divide and conquer, We must all remain united together to fight against the scale of the refined project to protect our way of life, rural amenity and village character.

We will provide updates to you all as the RTS process continues. Importantly please do not hesitate to contact MCQAG representatives on the telephone number or email below if you wish to discuss this further. We are happy to assist and advocate for you when dealing with Umwelt or Daracon.

MCQAG’s next committee meeting is on the 24th July at the Paterson School of Arts Hall, members and residents are welcome to attend.

Regards
James Ashton 
Secretary MCQAG
0413 616 677
info@mcqag.org

 

Brandy Hill Quarry.

There has not been any communication from Hanson since the CCC meeting early this year. However, James Moore has contacted Hanson regarding an offer they made at that meeting to provide a traffic speed display. The display is mounted on a trailer and would show drivers their actual speed as they approach the display. It does not record any data for subsequent analysis, and Hanson have asked that BHSA cover insurance for the month that they would allow. With the need for insurance and PSC, RMS and resident approval for a suitable location, there are a few hurdles before this could happen.

Although Hanson predicted at the last CCC that their Response to Submissions (RTS) may have been be ready by April, that has not yet happened, and could be months away.

We continue being wholly disappointed in the complete lack of any compromise in Hanson’s project scale, despite the years of CCC meetings and the huge number of opposing submissions from the community. Our disappointment in Hanson is even greater when we see that Daracon, who have never asked for 24/7, reduced their proposed hours of operation and also reduced their proposed road haulage annual tonnage by 40%, maximum trucks per day by 35% and maximum trucks per hour by 25% in their “Community Update” document. At least Daracon appear to be prepared to make some concessions in their Response to Submissions. Hanson have offered none. We can only hope that the NSW Department of Planning rejects Hanson’s approach.

We continue to:

  1. Vehemently oppose 24/7 quarry operations and the huge increase in both the average and maximum trucks per day and per hour. These would be a totally unacceptable assault on the amenity and residential character of the area.
  2. Demand that Hanson provide an off road pathway along Brandy Hill Drive and connecting the the Jacaranda preschool and Brandon park, bus bays and other safety improvements.
  3. Stand by all the other mitigation measures outlined in BHSAG’s submission.

Next Steps

  • We will continue investigating the speed display sign offered by Hanson.
  • Meetings will be held with Umwelt next week.
  • We are already drafting a presentation to the Independent Planning Commission- IPC (the new name for the Planning Assessment Commission – PAC).
    Once NSW planning accept Hanson’s RTS, and make recommendations to the IPC, we expect the IPC to hold a public meeting where key parties will be invited to make short presentations. That will be our last and only avenue to have some restrictions placed on Hanson’s ongoing operations.

Thats all for now. Thanks for your ongoing support. Any feedback via this website is always appreciated.

 

 

Hanson CCC Meeting in March

A CCC meeting was held on 9th March, attended by new members, including Bronwyn White , Chantal Parslow-Redman and James Moore representing BHSA. Peter Rees, Neil and Margarete, Paul LeMottee, Prue McGee and Robert Adams were the other community representatives

For the benefit of the new members, a brief tour of the quarry was conducted in vehicles. The main stops were the rock face where a blast was being prepared, and the new bund wall which is visible from Clarence Town Road near the electricity sub station. The old crushing equipment was not operating and was given a wide berth. I wonder why!

The CCC meeting was held in the old farm house at 888 Clarence Town Rd. Hanson has bought the property to add to the buffer zone around the Quarry.

All the community representatives were extremely disappointed with the meeting. This was expected to be the last CCC before Hanson completes their response to submissions, and it will be as Hanson advised that they expect to lodge it during April. We had asked for an agenda item where Hanson would discuss what they would change or offer to address the concerns in the opposing submissions.

This is what we asked for before the meeting:

In the light of the DPE’s letter to Hanson including the direction as follows:

“ The Department requests that Hanson provide a revised SIA which, at a minimum: a) responds to the potential social impacts of the project, and either proposes adequate mitigation measures or justification as to why no mitigation is warranted. Particular consideration should be given to the various measures put forward by the Brandy Hill & Seaham Action Group (e.g. restricted production and operating hours, construction of shared pathways and road safety measures). Proposed responses should follow the hierarchy of avoid, minimise and mitigate. “

We would like added to the agenda of the next meeting, a discussion of mitigation measures in the BHSAG submission. This is to ensure that Hanson understands the intent of those measures, and it will be an opportunity for Hanson to provide feedback on those measures or alternative measures that Hanson might be considering in its “Response to submissions “.

When we got to the agenda item titled “Response to submissions “, the Consultant from Key Insights spoke briefly about the difficulty in reconciling the needs of the quarry with the concerns raised, but offered no compromises. The consultant from RW Corkery then spoke about what they were doing to address the technical deficiencies identified in the noise, dust and other environmental sections of the EIS, and gave an overview of the project.

Apart from clarifying that due to the noise regulations, there would be a limit on overnight truck movements, no compromises or mitigation measures were presented that in any way addressed the communities concerns.

24/7, the high number of daily truck movements and the lack of safety infrastructure  along Brandy Hill Drive for pedestrians, cyclists and school buses were not addressed in any way whatsoever.

After 4 years of community “consultation “ and the wide support BHSA has had for limitations to be applied to the proposal and for Hanson to offer improvements to the transport corridor, Hanson have offered no compromises and no infrastructure for safety or amenity.

Perhaps Hanson will offer something in the “Statement of commitments “ that is part of their response, but we are not expecting anything based on the CCC meeting.

We expect that here’s will be a Planning Assessment Commission (PAC) meeting where BHSA will have another opportunity to present our case. We can only hope that the Department of Planning and the PAC will be more sympathetic than Hanson.

And on the Martins Creek Quarry front, a CCC meeting is being planned. Daracon has also engaged a consultant to help them with the response to submissions. Word has been received that the judgement on the DSC V Daracon court case is expected during April.

Neil and Margarete

PSC Forward planning information session

Here is another community matter of importance.

Some months ago I was invited, along with John Redman from VOWW, to attend a briefing session put on by the mayor. The meeting dealt with community expectations and wishes for the next planning stage.

The meeting was very productive and this is now stage 2 of that process. If you want a say in your area please consider going to this meeting.

Community Consultation – How do we want our West Ward: Seaham, Butterwick, Wallalong, Woodville etc to look like, feel like, lifestyle.

22EA1FF9-4FDD-4598-8BE8-9EE8E05E7445