The Brandy Hill Quarry Community Consultative Committee met last month by video conference. The finalised minutes and photo of the updated quarry entrance sign are included below. Click “Download” to read the minutes.

The two main topics covered were the progress on the management plans and expected timeframe for Hanson adopting the new consent, and PSC’s progress and expected timeframe for the design and construction of the shared pathway and bus-bays.

The first answer is perhaps late 2021 depending on DPIE approval of the draft management plans, and the second is that PSC have made little progress on even designing the pathway.

(PSC officers promised Margarete in a separate meeting, that there would be community consultations regarding the design and route for the pathway. As that consultation with BHSAG has not yet happened, we can only assume that the design work is not even at a draft stage.

The significance of the pathway is that is is a long overdue for the safety and amenity of residents, and for Hanson, while they can adopt the new consent conditions without the completed pathway, they are restricted to the current 700,000 tonnes per annum. Output can only increase beyond that and up to the 1.5m tonnes per annum limit after the footpath and bus-bays are completed.)

The complaints hotline phone number has been added to the sign

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s